Problem with credit |
Message boards : Number crunching : Problem with credit
| Author | Message | |
|---|---|---|
At the statistics af the Leiden project in BOINC manager I\'ve noticed something that I believe doesn\'t make sense.At one point the curve that shows the total credits(not the average) starts descending. | ||
| ID: 620 | Rating: 0 | rate: | [Reply to this post] | |
Message boards : Number crunching : Problem with credit